Quantcast
Channel: OpenPlant | AutoPLANT
Viewing all articles
Browse latest Browse all 12277

Forum Post: RE: OPM SS6 - Cannot change pipeline with multiple tapping connection to another spec

$
0
0
Hi Rahul, For the test case, I copied the mEX-OPM.mdb spec and renamed it to mEX-OPM-Copy.mdb, to make sure all components between the source and the destination spec are compatible. With user=OPModeler; project=OPModeler_Metric; interface=default: 1- define a pipeline using mEX-OPM spec 2- place a pipe length 3- create a tapping connection on the pipe 4- convert that pipe length to mEX-OPM-COPY spec Result = success. 5- convert that pipe length back to mEX-OPM spec Result = success. 6- create another tapping connect on the pipe 7- repeat step 4 result = no change occur, pipe length stays as mEX-OPM spec Tuan

Viewing all articles
Browse latest Browse all 12277

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>