Hi Harpreet, This need to do this as the support pipe guide requires to have clearance from the OD of the pipe not the nominal diameter. After doing the modifications below, the calculation for the BOX_DISTANCE is not adding the fields together, the value returned is the CLEARANCE_GAP only. 1. Add a new field PIPE_OD_M in the spec with the Pipe OD sizes, to 2 decimal places! Schema - OpenPlant 3D 2. Add OUTSIDE_DIAMETER to Directional Pipe Guide 3. Change the BOX_DISTANCE to use the OUTSIDE_DIAMETER, was NORMINAL_DIAMETER OpenPlant schema 4. Added the Outside_Diameter as below, Any help would be appreciated Ray
↧