OPM V8i SS5 08.11.09.568 OPM_CONNECTIVITY_TOLERANCE=1.5 My problem is to add gasket/bolt at equipment nozzle, not another piping component. If we delete the bolt/gasket between two piping components, disconnect could be detected and gasket/bolt could be added by fix disconnect, no problem on this case. But if bolt/gasket is deleted between piping component and equipment nozzle , an open end would be detected, and cannot add gasket/bolt. Besides, when we place flange at equipment nozzle, it can snap nozzle as a key point. If we want move a flange to a nozzle, cannot snap to the nozzle. OPM doesn't treat equipment nozzle same as piping component.
↧