Quantcast
Channel: OpenPlant | AutoPLANT
Viewing all articles
Browse latest Browse all 12277

Forum Post: AutoISO Relationship Manager error code reported -2147467259

$
0
0
When I have Isometrics open and I open a 3D drawing and start AutoISO, it will run through like it is working correctly, but breaks out the drawing into individual parts (one part for each new isometric). When I look at the autoiso.log I get the following error: Relationship Manager error code reported -2147467259 Relationship Type = 89 I have opened the project database and gone to the RELATIONSHIPINSTANCE table and there is no Relationship Type 89 for me to be able to delete like was described in https://communities.bentley.com/products/plant/f/autoplant-axsys-openplant-plantwise-forum/111411/atdb0718-relationship-manager-error-code-reported--2147467259 I am on AutoPLANT version 08.11.13.129 and using default specs/new drawing it still does this. Thanks, Paul

Viewing all articles
Browse latest Browse all 12277

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>