Hello, I have an i.dgn from another EPC and I need to select only certain components for installation during a construction window. I need to generate a bulk BOM for these materials. I'm trying to generate the report from within OPM (i.dgn is referenced into a blank OPM file). I have tried creating a grid report from a simple selection set, displayset, and an item set. The report contains the items from the entire file rather than just the selected ones. Is there a workflow to do what I'm asking? Note that there is no way to query these items from the model as there are no attributes relating directly to the construction window. Thank you.
↧